PHASE 1

TOTAL WEIGHT
2960 TONS
MAX. HEIGHT
25 M
DATE OF COMPLETION
JUNE 2011

PHASE 2

TOTAL WEIGHT
4210 TONS
MAX. HEIGHT
25 M
DATE OF COMPLETION
JULY 2012

Rack System, ANP, Electrical Room etc.

The total weight of steel structure for Bahru Stainless Phase 1 is 2960 tons and the major part is Rack System (1580 tons) and ANP (380 tons).

Rack system is steel rack support for piping, mechanical, electrical service and be a channel to all the buildings in Bahru Stainless site. Estimated rack length completed to date is 2.5km.

ANP consists of 7 nos portal frames which most of the steel columns built up by 830mm x 20mm thick web and 430mm x 35mm thick flange x 17mtr length.

AP2 Bay Structure Steel & Electrical Room

The total weight of steel structure for Bahru AP2 is 4000 tons. Most of the hot rolled steel used in this project is European Profile (Eg. HEA900, HEB600..).

The crane girder is formed up by plate with height 2.1m by 20m long (average weight is 14 ton/pcs). The built up twin columns is fabricated in one single piece with total length 26m (average weight is 22 ton/pcs).